~ anevilgiraffe ~
Showing posts with label Milling. Show all posts
Showing posts with label Milling. Show all posts
Friday, 21 November 2025

Building Bridges and River redux…

›
So life has been pretty shitty, so I’ve not been very motivated recently, doing little bits as the mojo allowed. Should have finished these ...
3 comments:
Monday, 12 August 2019

Miller Time (new pics)...

›
[OK, since I moved house, I've not done any photos of stuff and discovered last week that my new place isn't blessed for lighting l...
Thursday, 11 July 2019

Planning the base...

›
Okeydoke... thatch is done and in various states of touch up, base coat shenanigans. Base is sand done with patches where I want to blend i...
1 comment:
Friday, 5 July 2019

Mill interior

›
 OK, so the interior is kind of done, a couple of small bits will be added but I needed the first floor done so I could attach the roof an...
2 comments:
Friday, 17 May 2019

cogs and workings

›
Just a quick pic (phone still) of the millstones and workings. Quite chuffed with the cogs considering it’s fiddly and little... if you’...
1 comment:
Saturday, 11 May 2019

Water Mill WIP

›
OK, so the base to join in with the other river tiles is done. Went through several stages/designs but the main consideration was to avo...
2 comments:
Monday, 6 May 2019

diving back in...

›
So, I’ve been slowly getting a groove on, greenstuffed a load of zombies into the 17th century. I had them kind of half done from a few yea...
6 comments:
›
Home
View web version
Powered by Blogger.