the basic shell is up and running... there were a few teething problems with the prototype walls (as the room kits are planned to be available for sale at some point I believe) which I had to tweak with foampvc the same thickness of the plywood... but even that was nothing too big...

the window bay has had some plasticard put over the windows, there will be detail there and I should be able to work more easily on the plasticard (hopefully), I'm also thinking of giving that area a ceiling for some atmosphere and just to reinforce the structure as a whole... the other walls should be book cases... I've had to change my original plan a little bit, which had book cases within the room as well as around the walls, but the sheer scale of building those as well is a bit daunting... it may yet happen, we will see... there will be at least one massive table covered in books though (think end of the Hammer Dracula)...