OK, so the base to join in with the other river tiles is done. Went through several stages/designs but the main consideration was to avoid making the building look like it cut into the inevitable slope of the river - the slope is a result of placeable river sections and not a incline as far as models are concerned. That resulted in a larger base than originally envisioned, but hey...
I’ve added some texture to the wheel, the plain mdf is serviceable but I’m anal about that kind of thing. This is actually the inner side rather than a before shot as I’m not that organised. Ignore the hole in the middle, that was to allow a plastic tube in for the axel, which is an absent detail from the kit. Also, I was an idiot and built the wheel before thinking about any of this and my efforts then resulted in a broken spoke (hence the white plastic reinforcement).
And the visible side with liquid green stuff added and then scored to give some texture. I made a little irregularly toothed tool to do this and made sure to pick out the existing details of the retaining blocks and so on. Hopefully it will paint up ok. The hub is thin balsa which was hit with a steel brush.
The interior starting mock up. Think this should give the right impression, but I need to make some cogs to transfer the horizontal rotation to the vertical. It’s a basic idea of a mill and not a working model or anything, so gives the right impression I think.
And finally another consideration that I’d not thought of is that a different kit from a different manufacturer means different sized doors. I don’t mind the windows being different, but I do want my doors to be mix and match as needed which means consistency...
2 comments:
Nice progress.
Starting to take shape very nicely.
Post a Comment